NewsWork planning •Navigator oThe new <Resource exists> column is available and shows whether free resources are linked to the work process. oA new <Resources> filter for work plans and working processes is available in the <Connections> tab via the ... menu. Previously, resources were controlled via the <Other> filter. oThe texts for <Resource exists> and <Resource> can be overridden using Terms. oThe connection of work center, material and resource to work plans is now available in the toolbar via the <New> symbol. oManagement of favorites has been improved. Favorites are now grouped by type as in the menu. oResource favorites are available. oA new entry is available in the <Work plan> menu, which can be used to switch from a work plan shortcut to the work plan. oFolder/work plan links now have their own icon. This makes it easier to distinguish links from the originals. oThe field type is now also displayed for user fields in the process navigator. oThe navigator now restores the last opened tab. oThe standard CSV export of many work plans can now be cancelled. •Edit working processes oThe image display now shows the images of all selected working process lines. •Import work cycle elements oThe study overview now shows the status of the time study. oUsing the new import option <Create working process per SCO>, the work cycle elements marked with the same SCO are combined in one working process. •Process catalog oThe process catalog now restores the last opened tab. Standard times •Import SCOs oThe study overview now shows the status of the time study. Logic module •When copying masks, the layout elements are now also adopted. Calculation •Navigator oThe <Planning> tabs for projects and quotes have been renamed to <Cost Increases>. <Planning> is already used in the offer with other content. •Cost increases oCost increases can now also be specified for the current year. oIn the ... menu, the function for setting the cost increases for the current year is available for administrators. oCost increases are now also possible for individual material items in addition to projects and offers. oTo do this, a material item can be selected in the item tree of an offer and accessed via the local menu <Cost increases...>. oA new <material> view is available in the details view so that multiple material items can be assigned at the same time. In this view, all material items of a work plan or a working process are displayed in a list. The cost increases for multiple items can be changed from the local menu of this list. oMaterial cost increases are now offered separately for <purchased parts> and <components>. oCost increases for <one-time costs> can be awarded. oThe form block <Cost overview> has been adjusted accordingly. ERP interface •Quantity and unit for connected resources can now be specified when importing working processes. Task Scheduler •Task groups are available. •The task list can now be sorted manually. •The ERP import and ERP export tasks have been improved. The new <Perform Actions> option is available in the ... menu. This means that the actions defined in the ERP interface can be switched on and off specifically for individual tasks. The execution of the actions is switched off by default. •The task of sorting work plans and working processes has been improved. The new option <Database...> is available in the ... menu. This can be used to change the underlying database. •The <Database...> function is now available in the task menu. This allows the database on which the selected tasks are based to be changed quickly. •The <Check use lists> task was moved from the <System> task category to the <Work planning> category. •The scope of the <Check use lists> task has been changed. The scopes <resources> and <master data> on the top level have been removed. •A database can now be specified when creating the task <Delete inactive working processes>. •The data backup can now also back up databases outside the set database directory. The new <Database directory> field is available in the task dialog for this purpose. System administration •The topics <Actian Zen> and <ORTIMobjectbase> have been combined into one topic <Database>. Settings •Local settings oColors: Three new colors are available for work planning. The <Expanded 1, 2, 3> colors are used in the working process edit window when process rows are expanded. •System settings oPresentation ▪The new setting <Show status of original for links> is available. ▪Terms: new terms for work planning and calculation are available. oTime categories, allowances: Confirmations when adding and removing allowances groups can now be set. oERP interface, actions ▪Variables are now used in the saved paths to make it easier to transfer settings between different systems. ▪Status: You can control the creation of status definitions via the <Create non-existing status automatically> setting. System •User fields oA new property <Value from process> is available for user fields of the type <Process line and process module line>. If the property is activated, the value of the user field is fetched from the process underlying the row and displayed. User fields of the type <Working process and process module> and of the type <SCO> are examined. The user field is searched for using the field name. •Data navigator oThe data navigator has been removed from the main window. oParts of the data navigator are further e.g. used in the user management. Updates•All hotfixes that were provided for older versions are integrated in version 8.8. •The OpenSSL libraries have been updated to version 1.1.1s: libssl-1_1.dll, libcrypto-1_1.dll. •7-Zip has been updated to version 22.00: 7z.exe, 7z.dll. |