Time calculation

Nach oben  Vorige Seite  Nächste Seite

The time results can be exported in a time unit specified in the file format.

Info

If no time unit is specified in the file format, the time unit of the work plan or working process is used.

You can specify the time unit explicitly by defining a field for the unit and assigning the meaning work plan: unit, working process: unit or settings: unit.

Info

In addition to the normal time units, the internally used time unit HHM (hundredths of minutes HM) is available. Use this unit if you wish to transfer time results unaltered and without rounding differences.

During data export, the time unit is checked for validity. The unit must feature in the list of time units allowed for export (see user manual Settings, Settings, System settings, ERP interface, Units). If this is not the case, the best suited time unit will be determined and used.

Info

In addition to the normal time units, the internally used time unit HHM (hundredths of minutes HM) is available. Use this unit if you wish to transfer time results unaltered and without rounding differences.